Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note: Armstrong provide:-

Hot water systemsHot water systems
Heating systemsHeating systems
Packaged plant roomsPackaged plant rooms
 

Request Information

Home
Include Article
Advertise
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information External

Request Architectural product information Internal

Request Mechanical HVAC product information

Request Electrical product information

 

ARMSTRONG - Lancashire Constabulary Cuts Energy Costs And Reduces Carbon Footprint With Armstrong Packaged Plant Rooms

By replacing its old oil-fired boiler house, with four new Armstrong offsite manufactured packaged plant rooms, Lancashire Constabulary has reduced the energy bills for the Hutton Hall site by £245,633 per annum. It has also reduced CO2 emissions by 744 tonnes a year. Offsite manufacture enabled the new system to be installed within an extremely tight timescale (which would have otherwise meant site occupants being without heating and hot water in the winter months).

Lancashire Constabulary has responsibility for 220 buildings, including police stations and operational centres with an annual energy bill approaching £500,000 per year.

The system for supply of heating and hot water at one of its largest sites, the Hutton Hall Police Training Centre, in Preston, Lancashire, was in urgent need of replacement. The centralised oil-fired boiler, with two calorifiers for hot water supply, had ceased to manage the site’s demand effectively some years previously, necessitating the installation of new heating systems for the accommodation blocks. In 2006, it became necessary to install replacement systems for the remaining buildings at the site, including a sports hall, administrative centre, firing range, dining room and teaching block. The existing system was inefficient, with extensive distribution losses, and engineers advised the Constabulary that the boiler could not meet the needs of the site over the coming winter.

Project priorities
Lancashire Constabulary had a number of priorities. As the site is financed from public funds it was important to reduce the energy costs as much as possible. The energy manager, Ed Palmer, who has developed the Constabulary’s sustainability policy, also wanted to capitalise on the opportunity to improve the energy efficiency and carbon footprint for the estate, and to position the site to meet increasingly stringent environmental legislation. A key part of this strategy involved a move away from oil towards a gas-fired system with reduced carbon impact.

The nature of the operations at Hutton Hall also had an impact on the choice of equipment. The site houses several buildings with 24/7 demand, such as call centres on 24-hour duty, and the National Police Computer Database HQ.

The timescale of the project was such that, once the capital investment was approved, there was insufficient time to carry out the installation (using traditional onsite methods) before the onset of the colder weather. An alternative solution was sought that would ensure continuity of supply of hot water and heating for the site’s occupants.

Armstrong solution
Ed Palmer carried out a feasibility study comparing three alternative approaches. The solution which proved to be the most effective was the installation of four offsite constructed packaged plant rooms, incorporating highly-efficient variable speed systems based around the Armstrong MBS integrated heating solution, controlling Armstrong IVS pumps and pressurisation equipment.

The MBS incorporates fully modulating boilers, variable primary pumps, automatic fill/pressurisation unit and integrated controls, all pre-specified for optimum efficiency, and pre-assembled for rapid installation on site. It enables excellent boiler efficiencies to be achieved and exceeded without time-consuming mixing and matching of system components.

Instead of treating the condensing boiler in isolation, the MBS matches pumps, controls and hydraulic system design. This ensures compatibility of components and enables specifiers to meet and exceed the boiler efficiency levels required under the new Part L of the Building Regulations with energy-efficient, low carbon performance designed into the system as standard.

Part L2 calls for minimum overall boiler efficiencies of 84% in new build and 80% in existing buildings. The MBS can achieve overall seasonal efficiencies of 94%, providing significant energy savings and carbon reductions throughout the lifetime of the plant. As the system is fully integrated and pre-assembled, additional system design input is not necessary, and installation and commissioning can be achieved much more easily and quickly.

Cost savings and energy reductions
A year after the installation of the plant rooms, Lancashire Constabulary has been able to analyse the resulting energy reductions. The energy requirement of the site was reduced from the equivalent of 4,503,600 kWh per year to 2,550,730 kWh per year. A saving of 1,952,870kWh.

The reduction of 1,952,870 kWh in energy consumption, calculated at a cost of 6.5p per kWh (oil) equates to an annual saving of £126,936.55.

As the site has moved away from an oil-fired boiler in favour of highly-efficient condensing boilers there are further reductions in energy costs arising from the prices differences between gas and oil. Calculated based on a gas price of 1.8p per kWh and an oil price of 6.5p per kWh, the cost saving as a result of change of fuel is £118,696.45.

This means that the total cost-saving amounts to £245,633 per annum. It is estimated that the four packaged plant rooms have paid for themselves in one year.

Environmental improvements
The environmental benefits have also bee considerable. Calculated at a rate of 0.27 kg of CO2 per kW, the move to the new system has reduced carbon emissions by 525.27 tonnes per year. As the plant rooms use gas for heating instead of oil, there is a further reduction in carbon emissions resulting from the change of fuel of 217 tonnes of CO2 per year. This amounts to an overall reduction in CO2 emissions of 744 tonnes per year.

Streamlining the project
Constructing the packaged plant rooms off site also had project benefits. The packaged plant rooms were assembled concurrently with the excavations for the gas pipes rather than commencing once this work was completed. This significantly shortened the timescales for the project making it possible to complete it by the target date of the start of October. The installation time was also reduced from several weeks to just a few days. The plant rooms were delivered to site, fully assembled, requiring only final connections.

By completing the project by the target date, it was possible to guarantee continuity of supply of hot water and heating for site occupants. Traditional onsite methods of plant room construction could not have met the target date and would have continued into the winter months.

Finally, manufacturing the plant rooms in a purpose-designed factory instead of at the Hutton Hall site reduced the health and safety risks associated with the project. Contractor presence and traffic at the Hutton Hall site was also reduced.

Ed Palmer, Energy Manager for Lancashire Constabulary said, “It was only when we analysed the energy consumption at the end of the first year, that we realised just how much money the packaged plant rooms had saved the taxpayer. The equipment has paid for itself in just a year, and will continue to deliver cost savings throughout its life.

“In addition, with the timescale we were working to, there simply wasn’t any other way that we could have completed the installation before the onset of cold weather. And being without heating and hot water was not an option.”

Email: salesuk@armlink.com


Osram Led lights Energy efficient lighting Osram led lighting News 120410

Dorma Glass partitions Movable partitions Automatic doors Door systems News 120410

SSQ Slate flooring Slip resistant flooring Natural stone flooring News 120410

House Couturier Silk fabric Designer fabric Soft furnishings Handmade fabric News 120410

John Newton Waterproof membrane Damp proofing membrane Sump pump system News 120410

RVR Cctv surveillance Remote video surveillance Covert surveillance training News 120410

EnOcean Sustainable buildings Wireless sensors Cpd courses Cpd exhibition News 120410

MK Electric Cable trunking Cable management solution Anti-bacterial cable News 120410

Kingspan Solar thermal collectors Vacuum tubes Solar thermal vacuum News 120410

DiMart Electrical tool Cable stripping tool Electrical installation tools News 120410

Panel systems Aluminium insulated panels Panels insulated Aluminium panels News 120410

Toolstation Wood preservative Garden paint Drainage products Roofing products News 120410

Baxi Zero carbon heating Baxi ecogen Space heating systems News 130410

Marshall Tufflex Steel conduit Electrical cable Cable trunking Cable installations News 130410

Riegens Cirrus lighting Commercial lighting Interior lighting Office lighting News 130410

Mumford & Wood Timber windows Bespoke timber windows Timber windows doors News 130410

Gilberts Natural ventilation Air diffusers Linear diffuser Mistrale system News 130410

Harsco Modular building system Building modules Modular building manufacturer News 130410

Total Home Environment Heat recovery ventilation Climate system Energy saving ventilation News 130410

Tile Depot Floor tiles Wall tiles Kitchen tiling Stone tiles News 130410

Saint Gobain Sound insulation Isover insulation Insulation systems Wall insulation News 130410

Intelli Heat Electric radiators Electric heating Electric heaters Panel heaters News 140410

Marshall Tufflex Cable management Electrical cable Cable trunking Wiring systems News 140410

Mitsubishi R22 refrigerant Air conditioning equipment Heating air conditioning News 140410

Harlequin Dance floors Sprung dance floor Dance studio floor News 140410

Wolseley Kitchen showrooms Kitchen suppliers Kitchen manufacturers Kitchen consultants News 140410

Metro Rod Drainage design Drainage pipes Drainage software Drainage services News 140410

Roman Shower enclosures Bathroom accessories Bathroom furniture Shower manufacturer News 140410

Armstrong Variable speed pump Drainage pumps Water drainage pumps News 140410

Legrand Electrical fittings Light energy consumption Light management system News 140410

Gilberts Natural ventilation Linear diffusers Air diffusers Slot ventilation News 150410

Schneider Electrical switchgear Switchgear manufacturers Electrical transformers Automation control News 150410

Socomec Power distribution Uninterruptible power Power quality Switchgear systems News 150410

Laidlaw Door signage Commercial signage Architectural ironmongery Door ironmongery News 150410

Osmo Contract flooring Floor adhesives Taylor adhesives Flooring industry News 150410

FAAC Gate automation Access control Swing operator Removable bollards News 150410

Osram Led lighting Led lighting systems Osram led modules News 150410

Steadmans Roofing manufacturers Cladding Roofing cladding panels News 160410

Wavin Underfloor heating Underfloor heating manifold Surface heating systems News 160410

SSQ Natural slate roofing Roof slate Natural stone flooring News 160410

Windhager Wood pellet boiler Biomass heating systems Compact boiler News 160410

BSS Handrail fittings Galvanised handrail Hand rails Stair handrails News 160410

Thomann Hanry Stonework cleaning Urban grime Grime cleaning Building cleaning News 160410

Tekla software Building information modeling Structural engineering software News 160410

Washroom Washroom Shower cubicles Commercial shower cubicles Changing room showers News 160410

Kalzip Standing seam roofing Low U-value roofing Metal roofing and cladding Solar solutions Green roof systems News 190410

Steadmans Roofing panels Roofing products Roof cladding Structural products News 190410

Wavin Heat recovery systems Heat exchanger Water heat exchanger News 190410

SSQ Roofing slates Natural slate tiles Natural slate roofing News 190410

Action Storage Swimming pool lockers Swimming pool storage Plastic lockers News 190410

Alfa Laval Heat exchanger Compact heat exchangers Brazed heat exchanger News 190410

Eurisol Mineral wool insulation Acoustic insulation Cavity wall insulation News 190410

Tileplans Office floor Office floor tile Commercial flooring Office flooring News 190410

Wavin Underfloor heating systems Underfloor heating Underfloor heating installer News 200410

Levolux Heat recovery Solar shading systems Solar shading louvres News 200410

Armstrong Pressurisation units Armstrong pressurisation units Variable speed pumps News 200410

SSQ Slate roofing Natural slate roofing Slate roof tiles News 210410

Finning Power systems Uninterruptible power supply Uninterruptible power systems News 210410

Space Air conditioning systems Air heat pump Fan coils News 210410

Schneider Electrical equipment Rack power distribution Global energy management News 210410

Armstrong Hot water systems Heating systems Packaged plant rooms News 210410

TBS Washroom cubicles Wc cubicles Changing cubicles Washroom accessories News 210410

Meadowstone Natural stone Natural stone suppliers Cast stone manufacturers News 210410

NBT Building systems Building block systems Sustainability buildings News 210410

Alucobond Roof covering Roofing solutions Roofing sheets Roof cladding News 210410

Socomec Single phase ups Socomec ups Uninterruptible power supplies News 210410

Leaderflush Doorsets Doors external Doors internal Fire doors News 220410

Cembrit Dry lining Cement particle board Dry lining boards News 220410

Tarkett Floor coverings Specialist flooring Vinyl flooring Acoustic floor News 220410

Mitsubishi Heat pumps Heating systems Commercial heating Air conditioning News 220410

Armstrong Solar panels Biomass boilers Pellett boiler Speed boosters News 220410

Laidlaw Door ironmongery Doorsets Bathroom locksets Architectural doorsets News 220410

Clark Drain Drain covers Cast iron drains Clark drain covers News 220410

Armstrong Variable speed pumps Chilled water pumps Plant rooms News 230410

Knauf Roof insulation Thermal insulation Acoustic insulation Insulation supplier News 230410

Dow Roof insulation Flat roof insulation Roof insulation systems News 230410

Monodraught Natural ventilation Monodraught windcatchers Ventilation system Windcatcher ventilation News 230410

Dorma Door controls Door accessories Movable walls Swing door News 230410

Dimplex Heat pumps Energy efficient heating Domestic heat pumps News 230410

Schueco Aluminium casement windows Tilt and turn windows Doorsets News 230410

Clark Drain Manhole covers Recessed manhole covers Inspection chamber covers News 230410

Terrys Fabrics Ready made curtains Suede curtains Online fabric retailers News 230410

Osram Led flash Osram opto semiconductors Energy efficient lighting News 230410

Birchall Domestic heating Energy saving heating Energy saving ventilation News 230410

Codelocks Electronic locks Access control systems Mechanical door locks News 230410

Arundel Jones Associates Ltd Registered in England and Wales No. 07334149
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Hot water systems
Heating systems
Packaged plant rooms